Resettled life, unsettled state of education (Tamil, February 2016)
A study on the impact of resettlement on continuity od education in Ezhil Nagar and Tsunami Nagar
A study on the impact of resettlement on continuity od education in Ezhil Nagar and Tsunami Nagar
A study on the impact of resettlement on continuity od education in Ezhil Nagar and Tsunami Nagar
The C&AG's state audit report for all departments coming under the General and Social Services category, including the Housing and Urban Development department, was tabled in the Tamil Nadu Legislative assembly on 29th September 2015. The report brings to light many serious shortcomings in the functioning of the Tamil Nadu Slum Clearance Board.
From November 9-December 1, 2015, Chennai city and its outlying areas, which are part of Kanchipuram and Thiruvallur districts received continuous and very heavy rain. The city was flooded at least three times, with the last flood, caused by non-stop rain on December 1, and the consequent opening of the Chembarambakkam Eri (tank) as well as various other Eris on the outlying areas causing enormous damage and devastation.
A letter to the Minister of Environment, Forest and Climate Change with a list of suggestions from the members of Alliance of Indian Waste-pickers for additions to the draft SWM Rules with respect to recognition and integration of informal waste-pickers and waste recyclers
An annual report from the Government of India that compilesdata on accidents (roads, trains, factories, etc).
A WHO status report covering 180 countries that provides a snapshot of the road safety scenario globally and highlights the gaps and measures required.
The fourth version of the RTSB, dated 2015, which dilutes the penalties imposed.
A general report on the ID card camps organized by the CoC in Perungudi and Kodungaiyur with support from CAG and its partner organizations to register the waste pickers and issue them occupational ID cards
A two pager of the fact finding exercise conducted by Transparent Cities Network at Perumbakkam in October 2015 to assess the infrastructure and other facilities created in the resettlement colony